Hydro One – Martindale Transformer Station

  • Breezway Floor Tile Removal
  • Breezway Following interior Floor Tile, transite, caulking removal
  • East wall removal
  • Exterior Breezway Transite Removal (2)
  • Greater Sudbury-20130425-00319
  • Greater Sudbury-20130515-00478
  • Greater Sudbury-20130530-00548
  • Greater Sudbury-20130603-00557
  • Greater Sudbury-20130604-00566
  • Greater Sudbury-20130620-00637
  • Greater Sudbury-20130703-00683
  • Greater Sudbury-20130704-00705
  • Greater Sudbury-20130711-00754
  • Greater Sudbury-20130711-00765
  • Job complete
  • panel removal
  • Personal Decon Unit
  • removal
  • Scaffold set up (2)
  • Scaffold set up (3)
  • Type 3 work area set up (2)
  • Warning Signage

Designated Substances and hazardous materials were abated prior to the demolition of the frequency charger East Low Bay Building and breezeway and removal of asbestos-containing pipe insulation within the control building at the Martindale transformer station (Sudbury).